top of page
Search

(Atria Shopping Gallery) Fit Out Guidelines - Mall Requirements for Hoarding, Visual & Reinstatement

  • Writer: hG Group Enquiry MY
    hG Group Enquiry MY
  • 8 hours ago
  • 2 min read

DISCLAIMER: Please note that these guidelines may change without prior notice; we will do our best to update the information as frequently as possible. The information below is intended for your reference only. For the most accurate and detailed information, please contact the mall's fit-out team directly. MALL's DETAILS

1.

Mall's Name

Atria Shopping Gallery


2.

Mall's Co. Name

Atria Shopping Gallery Sdn Bhd


3.

Location

Damansara Jaya, Selangor


 

HOARDING & VISUAL (Indoor Lot & Kiosk) REQUIREMENTS

1.

Hoarding Material

White PVC Plywood

NOTES: Marine Plywood (Proposed Material If Outdoor Hoarding - Expose to Weather)

2.

Hoarding Structure

Timber


3.

Hoarding Door Type

Swing Door

1220mm x 2440mm

4.

Add-On (Counterweight)

a. For Kiosk (Free-Stand) b. Outdoor hoarding (Expose to Wind Load) c. Hoarding Height exceed 5meter


5.

Add-On (Fabric)

Not Required

Optional (If Required)

6.

Hoarding (Kiosk) Height

1220mm (4ft)


6.

Hoarding Visual Material

Tarpaulin


7.

Skirting

Not Required


NOTES: Click HERE for sample hoarding and/or visual installation at Atria for your reference

 

MALL FIT OUT GUIDELINES

1.

Site Dilapidation Picture(s)

Make sure take pictures of existing site condition before start work to avoid any dispute later.

2.

Floor Protection On-Site

Compulsory installation of floor protection at common walkway area for trolleys & workers mobilization during on-site work and clear off & clean up on daily basis after daily job done.

3.

CIDB Green Card

Worker(s) COMPULSORY to have CIDB Green Card in order to work within the mall.

4.

Aluminium Scaffold (BS SCAFFOLD) Metal Scaffold (A-Frame) Allowed

No requirement on scaffold usage.

 

REINSTATEMENT GUIDELINES

1.

Preliminaries

Site Arrangement & Documents Preparation

2.

Insurance

RM1mil Public Liability

3.

Reinstatement

a. Dismantle b. Demolish c. Move Out d. Clear Off

4.

a. Engage by Contractor(s) b. To Clear Out from Mall Loading Bay Area before 6am Daily c. STRICTLY NO OVERNIGHT

5.

3rd Party Panel Contractor(s)

a. Sprinkler b. Wet Chemical (If Have, for F&B Lot/Kiosk Only) c. LPG (If Have, for F&B Lot/Kiosk Only) d. Flushing (If Have Floor Trap within the Lot/Kiosk) e. Tiles Replacement (Supply & Install)

6.

Touch Up and/or Restoration

After Site Inspection by Mall Fit Out Team (IF REQUIRED ONLY based on Lot Condition) Frequent Restoration Item(s) as Listed Below: 1. Wall (Skim, Plastering & White Painting) 2. Ceiling (Plastering & Painting) 3. Tiles Replacement Lease Line Area (by Mall Panel Only) 4. Internal Lot Pelmet Close Up using Gypsum Board 5. Floor Tiles/Marble Polishing 6. Sprinkler (Level 1 - Paint RED) 7. Telephone Box (To Replace / Relocate Back to Original) 8. Isolator (To Replace / Relocate Back to Original) 


 
 
 

Recent Posts

See All

Comments


bottom of page