Mall/Shop (Lot or Kiosk) Reinstatement Request for Information (RFI), Job Scope & Requirements
- hG Group Enquiry MY
- Mar 12
- 2 min read
Updated: Apr 6
Dear Client(s), Please reply for information below before we proceed with REINSTATEMENT quotation preparation. Thank you
A. MAIN GENERAL INFORMATION REQUIRED:
Lot No.:
Mall/Building Name:
Lot Size:
Please attach lot floor plan (if got)
Shop Name:
Your Company Name (For quotation preparation):
Noisy hacking work timing allowed by mall/building?
Documentation or certification preparation such as (ONLY IF REQUIRED): a. WAH b. SSS, SHO or OSH-C c. Scaffolder level 1, 2 or 3 d. Scaffold inspector for green tag authorization e. Welder certification
f. CIDB green card g. Work schedule h. Method of statement for required job scope
i. HIRARC or JHA
j. Workers details (Name list with IC, Passport, Visa or Letter of Authorization etc)
B. INSURANCE TO PURCHASE BY?
HG (Us)
Client (You)
C. JOB SCOPE REQUIREMENT
A. Preliminaries
Floor protection
Lift protection (For office tower etc)
Manpower mobilization
Material and/or equipment mobilization
Site cleaning (daily after job done)
Site supervision
Reporting
B. Dismantle
Joinery / fixtures (Built-in cabinet)
Ceiling / plaster ceiling & structure
Wall panelling
Floor finishes (carpet or vinyl or laminate flooring)
Metal structure (if any)
Roller shutter
Glass panel
Signage
Electrical wiring
Lighting
AC (aircond) ducting
Plumbing piping
Timber raised up platform (if any)
Loose furniture
Kitchen equipment (if F&B lot)
C. Hack & Demolition Work
Floor tiles
Wall tiles (if any)
Floor cement screed till concrete slab
Brick wall
Raised up platform till concrete slab
D. Others (Please list out - IF ANY)
E. Add-On Services
Rorobin (Dumpster Bin) (day and/or night)
Lorry transportation services (3ton box lorry with tail-lift) (day and/or night)
Mover services (labor for loading and unloading) (day and/or night)
Temporary warehouse services (Bandar Kinrara)
Aluminium Mobile Tower Scaffold (for work at height access) (ONLY IF REQUIRED)
F. Touch Up Work (Only If Required)
Wall plastering
Wall painting
Ceiling plastering
Ceiling painting
Floor tiles replacement
Floor polishing (if need)
Brick wall (New erection - if need)
Floor cement screeding (New)
Electrical wiring (New)
Ceiling board (2'x4') (New installation - if need)
Sprinkler (Level 1) - Paint in RED
G. By 3rd Party Mall/Building PANEL Contractor
Pest control
Sprinkler dismantling
Wet chemical system dismantling
LPG gas piping & meter dismantling
Telephone line checking only
PA speaker checking only
Flushing services
AC / FCU / Exhaust cleaning & servicing
Tiles replacement (supply only and/or with installation)
Comments