(Sunway Velocity Mall) Fit Out Guidelines - Mall Requirements for Hoarding, Visual & Reinstatement
- hG Group Enquiry MY
- 5 hours ago
- 3 min read
DISCLAIMER: Please note that these guidelines may change without prior notice; we will do our best to update the information as frequently as possible. The information below is intended for your reference only. For the most accurate and detailed information, please contact the mall's fit-out team directly. MALL's DETAILS
1. | Mall's Name | Sunway Velocity Mall ![]() | |
2. | Mall's Co. Name | Sunway Velocity Mall Sdn Bhd | |
3. | Location | Cheras, Kuala Lumpur |
HOARDING & VISUAL (Indoor Lot & Kiosk) REQUIREMENTS
1. | Hoarding Material | MDF NOTES: Hoarding and visual installation arranged by Mall Fit Out ONLY. | NOTES: White PVC Plywood or Marine Plywood with Timber Structure Hoarding (Proposed Material If Outdoor Hoarding - Expose to Weather) |
2. | Hoarding Structure | Timber | |
3. | Hoarding Door Type | a. Sliding Door (Lot) b. Swing Door (Kiosk) | a. 1220mm x 2440mm b. 1220mm x 1220mm |
4. | Add-On (Counterweight) | a. For Kiosk (Free-Stand) b. Outdoor Hoarding (Expose to Wind Load) c. Hoarding Height exceed 5meter | |
5. | Add-On (Fabric) | Not Required | |
6. | Add-On (Transparent Plastic Sheet) | Vertical Transparent Plastic Sheet (Kiosk) | REMARKS: To avoid blocking mall patrons view which having see through effect when a center kiosk at common area installed with a hoarding |
7. | Hoarding (Kiosk) Height | 1220mm (4ft) | |
8. | Hoarding Visual Material | Tarpaulin | |
9. | Skirting | Aluminium Skirting (1inch) | Bottom Only |
NOTES: Click HERE for sample hoarding and/or visual installation at Sunway Velocity Mall for your reference
MALL FIT OUT GUIDELINES
1. | Pre-Reinstatement Briefing | Compulsory for a contractor's representative to attend pre-project briefing with mall fit out team to understand the mall and job requirement process flow before start work on-site. Set appointment prior before attending the pre-reinstatement briefing. |
2. | Site Dilapidation Picture(s) | Make sure take pictures of existing site condition before start work to avoid any dispute later. |
3. | Floor Protection On-Site (Canvas OR FloorGard) | Compulsory installation of floor protection at common walkway area for trolleys & workers mobilization during on-site work and clear off & clean up on daily basis after daily job done. |
4. | CIDB Green Card | Worker(s) compulsory to have CIDB Green Card in order to work within the mall. |
5. | a. OSH-Coordinator (OSH-C) b. Site Safety Supervisor (SSS) c. Safety & Health Officer (SHO) | Each project is compulsory to have either one of the role stated depends on project value to base on-site in order to comply to the safety requirement set by mall management. |
Aluminium Scaffold (BS SCAFFOLD) NOTES: Metal Scaffold A-Frame Allowed | For on-site worker(s) to access WORK AT HEIGHT, it is OPTIONAL under mall safety requirement to use ALUMINIUM SCAFFOLD with GREEN TAG tagging which inspect by AUTHORIZED & COMPETENT SCAFFOLD INSPECTOR. |
REINSTATEMENT GUIDELINES
1. | Preliminaries | a. Site Arrangement b. Documents Preparation |
2. | Insurance | a. RM1mil Public Liability |
3. | Reinstatement | a. Dismantle b. Demolish c. Move Out d. Clear Off |
4. | a. Engage by Mall Management | |
5. | 3rd Party Panel Contractor(s) | a. Sprinkler b. Wet Chemical (If Have, for F&B Lot/Kiosk Only) c. LPG (If Have, for F&B Lot/Kiosk Only) d. Flushing (If Have Floor Trap within the Lot/Kiosk) e. Tiles Replacement (Supply & Install) |
6. | Touch Up and/or Restoration | After Site Inspection by Mall Fit Out Team (IF REQUIRED ONLY based on Lot Condition) Frequent Restoration Item(s) as Listed Below: 1. Wall (Skim, Plastering & White Painting) 2. Ceiling (Plastering & Painting) 3. Tiles Replacement Lease Line or Common Walkway Area (by Mall Panel Only) 4. Internal Lot Pelmet Close Up using Gypsum Board 5. Floor Tiles/Marble Polishing 6. Sprinkler (Level 1 - Paint RED) 7. Telephone Box (To Replace / Relocate Back to Original) 8. Isolator (To Replace / Relocate Back to Original) |