
A Contractor's Support Company

Search Results
403 results found for "ioi city mall"
- Hoarding & Visual c/w Top & Side Fabric Cover (Kiosk), Vinstella Jewellery, Central Icity
Hoarding and visual (kiosk) c/w top & side fabric cover installation at Central Icity for Vinstella Jewellery #hoarding #visual #vinstella #jewellery #kiosk #centralicity #icity
- Hoarding (All White), Internal Zara Lot, Pavilion Kuala Lumpur
Hoarding (All-White) installation at Pavilion Kuala Lumpur. 17 September 2024.
- Hoarding (Outdoor, All White), Semenyih (Shop Lot) - Emergency Glass Break
Hoarding (outdoor, all white) installation at Semenyih (Shop Lot). 28 March 2025.
- Hoarding (All White) & Top Fabric Cover, Terminal Bersepadu Gombak, (GITT)
Hoarding (all white) and top fabric cover installation at Terminal Bersepadu Gombak (GITT). 26 February
- Hoarding (All White) with Hose Reel Door Access, Pavilion Bukit Jalil
Hoarding (all white) installation at Pavilion Bukit Jalil. 7 November 2024.
- Hoarding & Visual, Kiosk, Little Canton, KLIA, Arrival Hall Main Terminal Building (MTB)
Hoarding & visual (kiosk) installation at Arrival Hall, KLIA Main Terminal Building for Little Canton
- Hoarding (All White), Office Tower, UOA Business Park (Shah Alam)
Hoarding (white) installation at lobby, Tower 3, UOA Business Park, Shah Alam. 14 September 2024. #hoarding # white #officetower #uoabusinesspark #shahalam
- Hoarding (All White), Logo Sticker & Glass White Sticker, New Balance, Mitsui Outlet Park
Hoarding (all white), logo sticker & glass white sticker installation at Mitsui Outlet Park for New Balance
- Floor Protection Requirement during Job On-site
How to inform foreign workers to comply on mall and building floor protection requirement without telling #floorprotection #guideline #mallrequirement #buildingrequirement #drawnbycalvin
- Hoarding & Visual Installation, Defect Occurrence & Rectification Process
Example: A lot within a mall which need to renovate OR empty hence by installing a hoarding will provide For those tenant that moving out from the mall, visual normally not required to install by the tenant that leaving because it doesn't serve the purpose to inform public OR mall patron that you are leaving the mall. looking to announce to public OR mall patron that your brand is coming up within the mall.
- STEPS for Customized Hoarding Arrangement, Confirmation & Installation:
HG plan and send METHOD & CONCEPT of installation to CLIENT, MALL or BUILDING MANAGEMENT for approval CLIENT, MALL or BUILDING MANAGEMENT management approve the METHOD & CONCEPT HG start preparing hoarding details, documents & permit application for submission to CLIENT, MALL or BUILDING MANAGEMENT for final checking and approval HG getting green light from CLIENT, MALL or BUILDING MANAGEMENT to install HG (PE) for record keeping Inspection onsite by CLIENT, MALL or BUILDING MANAGEMENT and/or Professional
- What is Reinstatement? Why need Reinstatement & Restoration services?
Retail lots within shopping malls ( Mall reinstatement ) Commercial shop lots & buildings (factory, school job preparation Make sure obtain WORK PERMIT APPROVAL before start work PEST CONTROL SERVICES by MALL ordered which park at loading bay REPEAT step 7, 8 and 9 until the reinstatement work complete BY MALL partition, bulkhead etc make good, replacement and new installation (if required) NOTES: Different mall For more accurate preparation, please check with mall fit out and/or building management team.