
A Contractor's Support Company

Search Results
466 results found for "sunway putra mall"
- Hoarding & Visual Installation, Defect Occurrence & Rectification Process
Example: A lot within a mall which need to renovate OR empty hence by installing a hoarding will provide For those tenant that moving out from the mall, visual normally not required to install by the tenant that leaving because it doesn't serve the purpose to inform public OR mall patron that you are leaving the mall. looking to announce to public OR mall patron that your brand is coming up within the mall.
- STEPS for Customized Hoarding Arrangement, Confirmation & Installation:
HG plan and send METHOD & CONCEPT of installation to CLIENT, MALL or BUILDING MANAGEMENT for approval CLIENT, MALL or BUILDING MANAGEMENT management approve the METHOD & CONCEPT HG start preparing hoarding details, documents & permit application for submission to CLIENT, MALL or BUILDING MANAGEMENT for final checking and approval HG getting green light from CLIENT, MALL or BUILDING MANAGEMENT to install HG (PE) for record keeping Inspection onsite by CLIENT, MALL or BUILDING MANAGEMENT and/or Professional
- What is Reinstatement? Why need Reinstatement & Restoration services?
Retail lots within shopping malls ( Mall reinstatement ) Commercial shop lots & buildings (factory, school job preparation Make sure obtain WORK PERMIT APPROVAL before start work PEST CONTROL SERVICES by MALL ordered which park at loading bay REPEAT step 7, 8 and 9 until the reinstatement work complete BY MALL partition, bulkhead etc make good, replacement and new installation (if required) NOTES: Different mall For more accurate preparation, please check with mall fit out and/or building management team.
- Hoarding & Visual, F.O.S, Gamuda Quayside
Hoarding and visual installation at Gamuda Quayside Mall for F.O.S. 9 March 2025.
- STEPS for Insurance Purchase for Work Permit Submission:
nominated contractors Contract Value: RMXXX,000.00 Location of Risk: G12, G13 & G14 at The Shopping Mall quotation INSURANCE company to prepare INSURANCE COVER NOTE and send to HG HG submit permit application to Mall COVER NOTE with OTHERS necessary documents HG wait for permit approval or comment or feedback from Mall
- Hoarding (Sample MDF) on Construction Site
Sample MDF board hoarding installation during mall construction site stage #sample #hoarding #mdf
- Sticker & Banner (Branding), Various, Evolt Karting, Aeon Bukit Indah, Johor Bahru
Sticker & hanging banner installation for various location (lift, escalator, boom gate, mall entrance
- Frequent Asked Questions (FAQ) - Hoarding Details & Process
HOARDING (KIOSK) - WHOLE FABRIC COVER 1 Hoarding Kiosk Sample Kiosk Hoarding Height (Depends on Mall before that other contractors used the sand without refill back which causing the hoarding collapse as all 1st Details Required (Pre-Job) Lot number Which mall / building? payment arrangement) - Client to proceed & provide information as below: Installation date Who is the mall (HG - INTERNAL USE ONLY) DETAILS REQUIRED for FABRICATION PROCESS Lot or kiosk Lot number Mall name
- What is Hoarding?
HG currently is the panel hoarding & visual contractor for most of the shopping malls within the country
- What is Scaffold?
when working at height Scaffold installation without comply to safety requirement might have risk to fall Cantilever scaffold Bridge scaffold Escalator access scaffold Metal A-frame scaffold system NOTES: All